Building Safety Levy

This will apply to most new residential developments from 1 October 2026.

The Building Safety Levy (the levy) is a charge on most new residential developments (unless exempt) in England. The levy is designed to help fund the remediation of building safety defects and improve the safety of residential buildings.

The levy is charged on relevant building control applications and notices submitted on or after 1 October 2026.

The following applications will have to include information for the purposes of the levy otherwise the application may be rejected. Local authority building control must reject initial notices if levy information has not been included.

  • Building control full plans applications.
  • Initial notices.
  • High Rise Building applications for works that provide at least one dwelling or a bedspace in Purpose Built Student Accommodation.

Developers must also give more information for levy calculation at commencement notice stage.

Applicable works

The levy applies to developments resulting in the provision of:

  • 10 or more dwellings, or
  • >30 or more bed spaces in purpose-built student accommodation (PBSA)

Certain residential-led developments that create new homes or student bed spaces.

Exempt works

The following are exempt from the levy:

  • Social or affordable housing
  • housing built by a non-profit registered provider of social housing (and their wholly owned subsidiary)
  • Certain residential-led developments that create new homes or student bed spaces

The regulations list other types of building that are exempt: The Building Safety Levy (England) Regulations 2025 (GOV.UK)

Developers seeking an exemption must provide the required information and evidence as part of the levy process.

Who calculates the charge

Local authorities with building control responsibility will act as levy collecting authorities.

The collecting authority, after provision of information and evidence at the commencement notice stage, will calculate the levy charge.

Levy rates

Levy rates are set nationally by government and are charged by square meter of chargeable floor space. The levy charge is calculated using information provided by the developer during the building control process.

Rates are published in the rates table: Building Safety Levy: Levy rates and calculations (GOV.UK)

Levy rates are set by legislation and cannot be altered by Bradford Council.

How to apply

The following forms should be used alongside the existing building control system at application and commencement stage to provide levy information as required:

Completed forms must be sent to developercontributions@bradford.gov.uk.

If payment is not made

The building control authority will withhold the completion certificate or reject the final certificate.